EZ Power & Light — Family Owned Since 2018

Electrical Panel Upgrade in Woodland Hills, CA

100A to 200A service upgrades in Woodland Hills — Federal Pacific and Zinsco replacement, permitted and owner-installed.

Electrical Panel Upgrade in Woodland Hills, Los Angeles County

EZ Power & Light upgrades electrical panels throughout Woodland Hills, Los Angeles County. Woodland Hills homeowners trust EZ Power & Light for reliable electrical service throughout this upscale West Valley community. From EV charger installations to generator backup for wildfire season, we keep Woodland Hills homes powered and protected.

A panel upgrade in Woodland Hills is usually driven by one of three things: a dangerous obsolete panel (Federal Pacific or Zinsco), a panel that's simply full, or a new load — an EV charger, heat pump, or solar + battery — that the existing service can't carry. We see all three across Woodland Hills Country Club, Vista del Monte, Walnut Acres and the rest of Woodland Hills.

We quote flat-rate, never hourly. The owner walks your panel, runs the load calculation, and gives you a written number the same day — and that number is what you pay.

Why Woodland Hills homes need panel upgrades

A lot of Woodland Hills's housing stock predates the electrical demands of a modern home. Panels installed for a 1960s or 1970s household — a few lights, a stove, a TV — are now being asked to carry EV chargers, induction ranges, heat pumps, and home offices. When a panel is undersized or obsolete, breakers trip, bus bars overheat, and in the worst case it becomes a fire risk.

Federal Pacific and Zinsco panels are a specific concern. Independent testing has shown their breakers fail to trip reliably under overload — and many California insurers now refuse to renew homeowner policies until they're replaced. If you have one in Woodland Hills, replacing it is both a safety upgrade and, increasingly, an insurance requirement.

Panel upgrade permits in Woodland Hills

Every panel upgrade in Woodland Hills is permitted and inspected. We pull the LADBS electrical permit under our C-10 license and coordinate the meter disconnect and reconnect directly with LADWP.

We meet the inspector on site, restore power the same day, and label every breaker before we leave. We run the same process in nearby Calabasas and Tarzana.

Woodland Hills neighborhoods we serve

Woodland Hills Country ClubVista del MonteWalnut AcresWoodland Hills Estates

Common panel upgrade situations in Woodland Hills

The specific electrical panel upgrade work Woodland Hills homeowners and businesses call us for.

If you have
Hillside homes with long service runs
We do

Proper conduit + service entrance sizing.

If you have
Insurance-flagged older panels
We do

Full panel replacement with signoff letter.

If you have
PSPS power shutoffs
We do

Generac 22kW whole-home install in ~2 weeks.

If you have
Adding an EV charger
We do

Upgrade to 200A with subfeed for the EV circuit.

If you have
Federal Pacific or Zinsco panel
We do

Replace immediately. Fire hazard.

How a Woodland Hills panel upgrade job runs

Start to finish — the same process on every Woodland Hills job, with the owner on site.

  1. 1

    On-site assessment

    30 minutes

    Owner walks your panel, runs load calc, photographs the existing service. Written quote same day.

  2. 2

    Permit + LADWP coordination

    3–10 days

    LADBS electrical permit pulled. Utility disconnect/reconnect scheduled.

  3. 3

    Panel swap day

    6–8 hours

    Meter pulled, new service entrance installed, new 200A panel wired and labeled.

  4. 4

    Final inspection

    3–5 business days

    LADBS inspector signs off. We meet them on site.

300+
Panels replaced
1 day
Typical turnaround
100%
First-inspection pass
Flat
Rate pricing

What Woodland Hills customers say

TB
Tanya B.

2 months ago

Panel upgrade plus whole home surge protection. Great work. Inspector complimented the workmanship.

Panel Upgrade·Woodland Hills, CA
AK
Alicia K.

8 months ago

Very smooth experience. 200 amp upgrade with a surge protector installed at the same time.

Panel Upgrade·Woodland Hills, CA
SK
Sandra K.

a year ago

After last year's wildfire outages I finally got a whole-home generator. EZ Power installed a Generac 22kW and it automatically kicked on during the next outage. Worth every penny. Excellent work.

Generator Installation·Woodland Hills, CA
PN
Priya N.

a year ago

Emporia Level 2 charger. Install was fast and clean. The owner explained how to use the app and everything. Really nice guy.

EV Charger Installation·Woodland Hills, CA

Electrical Panel Upgrade in Woodland Hills — FAQs

Need electrical panel upgrade in Woodland Hills?

Flat-rate quotes, permits handled, owner on every job. Call directly any time.

CallText