Electrical Panel Upgrade — Los Angeles

From 100 amps to 200, done in one day.

Old Federal Pacific or Zinsco panel? We replace it safely and permitted. 200A Square D, Siemens, or Eaton. Coordinated with LADWP/SCE. Passed first inspection every time.

300+
Panels replaced
1 day
Typical turnaround
100%
First-inspection pass
Flat
Rate pricing
Modern 200-amp residential electrical panel
Modern 200-amp residential electrical panel
Modern 200-amp residential electrical panel

How do I know if I need a panel upgrade?

You need an upgrade if you have a Federal Pacific, Zinsco, or Pushmatic panel (fire hazards); if breakers trip under normal use; if you are adding an EV charger, heat pump, or solar + battery; or if your panel is full with no open slots.

Panels wear out. We see heat discoloration, corroded bus bars, and breakers that weld themselves shut. A proper 200A upgrade is one of the most impactful safety improvements you can make to a home.

When to upgrade your panel

Any one of these is a signal. Several together means the upgrade is overdue.

If you have
Adding an EV charger
We do

Upgrade to 200A with subfeed for the EV circuit.

If you have
Federal Pacific or Zinsco panel
We do

Replace immediately. Fire hazard.

If you have
Breakers tripping frequently
We do

Load calc + upgrade or subpanel.

If you have
Adding heat pump / induction cooking
We do

New 200A panel with dedicated circuits.

If you have
Planning solar + battery
We do

Panel upgrade sized for solar backfeed + EV.

If you have
Panel is full with no open slots
We do

Subpanel or larger service.

Is a Federal Pacific panel actually dangerous?

Yes. Independent testing has shown FPE Stab-Lok breakers fail to trip at significantly higher rates than modern breakers. A breaker that does not trip under overload means wires overheat and start fires.

Many California insurers now refuse to renew homeowner policies with Federal Pacific or Zinsco panels installed. Replacing them is a safety upgrade and an insurance requirement in many cases.

From assessment to inspection — 1 to 2 weeks

On-site work is one day. The full timeline includes permit, utility coordination, and inspection.

  1. 1

    On-site assessment

    30 minutes

    Owner walks your panel, runs load calc, photographs the existing service. Written quote same day.

  2. 2

    Permit + LADWP coordination

    3–10 days

    LADBS electrical permit pulled. Utility disconnect/reconnect scheduled.

  3. 3

    Panel swap day

    6–8 hours

    Meter pulled, new service entrance installed, new 200A panel wired and labeled.

  4. 4

    Final inspection

    3–5 business days

    LADBS inspector signs off. We meet them on site.

Panels we install

Industry-standard panels only. If your old panel is Federal Pacific, Zinsco, Pushmatic, or Challenger, it has to go.

Square D QO

Included in flat-rate quote

Our default pick

  • +Industry gold standard
  • +QO breakers widely available
  • +Superior trip reliability

Siemens

Included in flat-rate quote

Quality alternative

  • +Heavy-duty bus bar
  • +Cost-competitive
  • +Good breaker selection

Eaton

Included in flat-rate quote

Residential and commercial

  • +BR or CH line options
  • +Strong warranty

Panel upgrade terms worth knowing

Electrical work uses specific terms. Here is what the jargon means in plain English.

Federal Pacific Electric (FPE) Stab-Lok
A panel brand manufactured 1950s–1980s with documented breaker failure rates creating fire risk.
Zinsco
A panel brand later sold as Sylvania-Zinsco with aluminum bus bar corrosion and breaker failure issues.
Service entrance
The conductors and enclosure delivering utility power from the weatherhead or meter to the main panel.
LADBS
Los Angeles Department of Building and Safety, the AHJ that issues electrical permits and conducts inspections in the City of LA.
300+
Panels replaced
1 day
On-site
First try
Inspection
Flat
Rate pricing

Panel upgrade FAQs

Panel upgrades across LA and Ventura County

Old panel? Let's talk.

Free on-site assessment. Flat-rate quote same day. Federal Pacific and Zinsco specialists.